I have recently decided to renovate one of my units (2bed, Int Laundry, 1Bath and Open living)
What should i start with….
Kitchen? Bathroom? Floors? Painting?
What is the best time-line for this renovation?
Kind Regards,
StefonEasy things:
– Bed, Lounge, Hallways – Repaint, Polish floors (pending floor type) and new curtains.
– Redo cupboards with new flooring and paint if neededHard things (non-cheap):
Kitchen – Cheap Cab's, new benchtop (stone or laminex, pending your target and goal), new flooring, splashbacks
bathroom – new cupboard and basin, clean and possibly replace old tiling, new flooring,Cheers,
MiikeOld carpet covered floors keep on floor while painting then replace after painting floor.
If plumbing needed it has to be done before you put the tiles , wall coverings , plaster board , ect on to walls as access is required by the plumber and damage can be done to walls. Check with plumber and electrician as to what they need to do to the walls before doing work on the walls.
Thanks guys helps alot.
Hi SOLD,
Personally I prefer to leave the majority of the painting and then the flooring until last (at least in the traffic areas where things will be dragged through while you're trying to rip out and install things like kitchen and bathroom. Best tip is to work your way towards the door so you leave minimal damage anywhere!
If you're in Sydney, have a look at my web site. I might be able to help further