Hi Darren.
Been researching this myself for the fast 3 months.
FIRSTLY……..and foremost, You need to check with the shire if it is subdividable.!!!!!!!!!!!!!
If you have scheme water, minimum 6k for watercorp "Head Works" (another water connection)
Minimum 5k for a Town Planner (Surveyor) to subdivide the block for you.
If you buy the other 2 out, you won't be up for CGT, they will., (Until you sell your share)Perhaps if you're in a position, you can apply for an equity loan on the block to buy the other two out.
You will be liable for a fee to transfer the land solely in your name too.30k for deep sewarge??? I paid for my mums' 2 tears ago and it only cost 4k. that included 45m of line laid, septic decomisioned. Her house is about 50 yrs old. Where is your IP
With any asbestos item (roofing/fencing) the major cost is in the disposal of the asbestos…….or so companies say. I'm in Perth and I have the same type of roof. I received quotes ranging from 7k – 11k to remove and replace with colour bond.
Hi
I am eager to read from any one from Perth who have subdivided their block to give me a rough estimate of cost.( from 1 lot to 2)For Demolition i have quotes ranging from 12k – 20k (Huge Diff). Awaiting quotes from Town planners i have already contacted, but am fearful of being ripped off……Cheers